Leiden University will be constructing a new building for the Faculty of Science, spread over three phases.  Phase 1 covers the Science Campus of 45,000 m2 and has already been made operational. The campus consists of three wings connected by an atrium. The entire Gorlaeus Building must be completed by 2026, providing a total of…


Leiden University will be constructing a new building for the Faculty of Science, spread over three phases. 

Phase 1 covers the Science Campus of 45,000 m2 and has already been made operational. The campus consists of three wings connected by an atrium.
The entire Gorlaeus Building must be completed by 2026, providing a total of about 100,000 m2. All the Faculty’s departments and institutes will be housed under one roof. The new building is thus meant to encourage encounters and interaction between institutes and educational units, between researchers and students and between different fields of research.
At the moment, we are working on the structural design of the second phase.


  • Living Lab moves: first new ditches dug

    Leiden University’s Living Lab is moving to the middle of the Leiden Bio Science Park. In the lab’s new home between the University of Applied Sciences, Mentor and Naturalis Biodiversity Center, the first ditches have now been dug. This new…

  • Improving the public space

    The goal of the project is to improve the overall quality of the park, which is the largest innovation district in the field of Life Sciences & Health in the Netherlands. An important part of this regards improving the accessibility…